Decision Log

Product and cybersecurity architecture understanding package generated from Markdown-derived requirements.

Last updated: 2026-06-29 11:49
RTRFQX Review TeamWorkspace

Decision Log

Product and cybersecurity architecture understanding package generated from Markdown-derived requirements.

Decision Capture Model

Every customer answer must map to a clarification Question ID. Every decision must keep an owner, status, affected baseline areas, and evidence or meeting reference.

Decision Statuses

  • Open
  • Answered
  • Accepted Assumption
  • Rejected Assumption
  • Deferred
  • Requires Follow-Up
  • Superseded
  • Closed

Decision Fields

  • Decision ID
  • Question ID
  • Decision Statement
  • Customer Answer
  • Decision Status
  • Decision Owner
  • Decision Date
  • Affected Requirement IDs
  • Affected Feature IDs
  • Affected Interface IDs
  • Affected Security Capability IDs
  • Affected Architecture Elements
  • Baseline Impact
  • Follow-Up Required
  • Evidence Reference

Baseline Impact Classes

  • Confirms requirement
  • Rejects assumption
  • Refines interface
  • Refines security capability
  • Refines architecture element
  • Adds new open question
  • No baseline impact

Decision Log

Generated: 2026-06-17T15:29:25+00:00

No customer answer baseline has been ingested yet.

Open Decision Register

Generated: 2026-06-23T20:54:40+00:00

All entries are open until a customer answer is captured and mapped through the post-workshop delta process.

Decision: D-001

  • Question ID: CQ-BOUNDARY-03
  • Decision statement: Confirm disposition for CQ-BOUNDARY-03 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-1001379436-P10-000-01-0003
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Blocks architecture baseline
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-002

  • Question ID: CQ-BOUNDARY-05
  • Decision statement: Confirm disposition for CQ-BOUNDARY-05 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-1001379436-P10-000-01-0011
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Blocks architecture baseline
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-003

  • Question ID: CQ-BOUNDARY-127
  • Decision statement: Confirm disposition for CQ-BOUNDARY-127 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0005
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Blocks architecture baseline
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-004

  • Question ID: CQ-BOUNDARY-158
  • Decision statement: Confirm disposition for CQ-BOUNDARY-158 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0246
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Blocks architecture baseline
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-005

  • Question ID: CQ-BOUNDARY-199
  • Decision statement: Confirm disposition for CQ-BOUNDARY-199 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS154-0035
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Blocks architecture baseline
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-006

  • Question ID: CQ-BOUNDARY-201
  • Decision statement: Confirm disposition for CQ-BOUNDARY-201 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0006
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Blocks architecture baseline
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-007

  • Question ID: CQ-BACKEND-02
  • Decision statement: Confirm disposition for CQ-BACKEND-02 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0055
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Blocks implementation planning
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-008

  • Question ID: CQ-BOUNDARY-01
  • Decision statement: Confirm disposition for CQ-BOUNDARY-01 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-1001379436-P10-000-01-0001
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-009

  • Question ID: CQ-BOUNDARY-02
  • Decision statement: Confirm disposition for CQ-BOUNDARY-02 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-1001379436-P10-000-01-0002
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-010

  • Question ID: CQ-BOUNDARY-04
  • Decision statement: Confirm disposition for CQ-BOUNDARY-04 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-1001379436-P10-000-01-0006
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-011

  • Question ID: CQ-BOUNDARY-06
  • Decision statement: Confirm disposition for CQ-BOUNDARY-06 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-1001379436-P10-000-01-0020
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-012

  • Question ID: CQ-BOUNDARY-07
  • Decision statement: Confirm disposition for CQ-BOUNDARY-07 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-1001379436-P10-000-01-0023
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-013

  • Question ID: CQ-BOUNDARY-08
  • Decision statement: Confirm disposition for CQ-BOUNDARY-08 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0003
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-014

  • Question ID: CQ-BOUNDARY-09
  • Decision statement: Confirm disposition for CQ-BOUNDARY-09 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0046
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-015

  • Question ID: CQ-BOUNDARY-10
  • Decision statement: Confirm disposition for CQ-BOUNDARY-10 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0048
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-016

  • Question ID: CQ-BOUNDARY-100
  • Decision statement: Confirm disposition for CQ-BOUNDARY-100 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0146
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-017

  • Question ID: CQ-BOUNDARY-101
  • Decision statement: Confirm disposition for CQ-BOUNDARY-101 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0147
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-018

  • Question ID: CQ-BOUNDARY-102
  • Decision statement: Confirm disposition for CQ-BOUNDARY-102 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0149
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-019

  • Question ID: CQ-BOUNDARY-103
  • Decision statement: Confirm disposition for CQ-BOUNDARY-103 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0150
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-020

  • Question ID: CQ-BOUNDARY-104
  • Decision statement: Confirm disposition for CQ-BOUNDARY-104 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0151
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-021

  • Question ID: CQ-BOUNDARY-105
  • Decision statement: Confirm disposition for CQ-BOUNDARY-105 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0155
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-022

  • Question ID: CQ-BOUNDARY-106
  • Decision statement: Confirm disposition for CQ-BOUNDARY-106 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0156
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-023

  • Question ID: CQ-BOUNDARY-107
  • Decision statement: Confirm disposition for CQ-BOUNDARY-107 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0158
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-024

  • Question ID: CQ-BOUNDARY-108
  • Decision statement: Confirm disposition for CQ-BOUNDARY-108 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0160
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-025

  • Question ID: CQ-BOUNDARY-109
  • Decision statement: Confirm disposition for CQ-BOUNDARY-109 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0162
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-026

  • Question ID: CQ-BOUNDARY-11
  • Decision statement: Confirm disposition for CQ-BOUNDARY-11 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0127
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-027

  • Question ID: CQ-BOUNDARY-110
  • Decision statement: Confirm disposition for CQ-BOUNDARY-110 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0174
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-028

  • Question ID: CQ-BOUNDARY-111
  • Decision statement: Confirm disposition for CQ-BOUNDARY-111 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0180
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-029

  • Question ID: CQ-BOUNDARY-112
  • Decision statement: Confirm disposition for CQ-BOUNDARY-112 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0191
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-030

  • Question ID: CQ-BOUNDARY-113
  • Decision statement: Confirm disposition for CQ-BOUNDARY-113 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0210
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-031

  • Question ID: CQ-BOUNDARY-114
  • Decision statement: Confirm disposition for CQ-BOUNDARY-114 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0249
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-032

  • Question ID: CQ-BOUNDARY-115
  • Decision statement: Confirm disposition for CQ-BOUNDARY-115 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0253
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-033

  • Question ID: CQ-BOUNDARY-116
  • Decision statement: Confirm disposition for CQ-BOUNDARY-116 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0255
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-034

  • Question ID: CQ-BOUNDARY-117
  • Decision statement: Confirm disposition for CQ-BOUNDARY-117 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0259
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-035

  • Question ID: CQ-BOUNDARY-118
  • Decision statement: Confirm disposition for CQ-BOUNDARY-118 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0264
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-036

  • Question ID: CQ-BOUNDARY-119
  • Decision statement: Confirm disposition for CQ-BOUNDARY-119 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0272
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-037

  • Question ID: CQ-BOUNDARY-12
  • Decision statement: Confirm disposition for CQ-BOUNDARY-12 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0130
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-038

  • Question ID: CQ-BOUNDARY-120
  • Decision statement: Confirm disposition for CQ-BOUNDARY-120 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0283
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-039

  • Question ID: CQ-BOUNDARY-121
  • Decision statement: Confirm disposition for CQ-BOUNDARY-121 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0291
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-040

  • Question ID: CQ-BOUNDARY-122
  • Decision statement: Confirm disposition for CQ-BOUNDARY-122 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0324
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-041

  • Question ID: CQ-BOUNDARY-123
  • Decision statement: Confirm disposition for CQ-BOUNDARY-123 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0327
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-042

  • Question ID: CQ-BOUNDARY-124
  • Decision statement: Confirm disposition for CQ-BOUNDARY-124 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0344
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-043

  • Question ID: CQ-BOUNDARY-125
  • Decision statement: Confirm disposition for CQ-BOUNDARY-125 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0345
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-044

  • Question ID: CQ-BOUNDARY-126
  • Decision statement: Confirm disposition for CQ-BOUNDARY-126 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0002
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-045

  • Question ID: CQ-BOUNDARY-128
  • Decision statement: Confirm disposition for CQ-BOUNDARY-128 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0010
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-046

  • Question ID: CQ-BOUNDARY-129
  • Decision statement: Confirm disposition for CQ-BOUNDARY-129 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0021
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-047

  • Question ID: CQ-BOUNDARY-13
  • Decision statement: Confirm disposition for CQ-BOUNDARY-13 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0141
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-048

  • Question ID: CQ-BOUNDARY-130
  • Decision statement: Confirm disposition for CQ-BOUNDARY-130 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0033
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-049

  • Question ID: CQ-BOUNDARY-131
  • Decision statement: Confirm disposition for CQ-BOUNDARY-131 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0041
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-050

  • Question ID: CQ-BOUNDARY-132
  • Decision statement: Confirm disposition for CQ-BOUNDARY-132 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0062
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-051

  • Question ID: CQ-BOUNDARY-133
  • Decision statement: Confirm disposition for CQ-BOUNDARY-133 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0066
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-052

  • Question ID: CQ-BOUNDARY-134
  • Decision statement: Confirm disposition for CQ-BOUNDARY-134 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0067
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-053

  • Question ID: CQ-BOUNDARY-135
  • Decision statement: Confirm disposition for CQ-BOUNDARY-135 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0076
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-054

  • Question ID: CQ-BOUNDARY-136
  • Decision statement: Confirm disposition for CQ-BOUNDARY-136 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0085
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-055

  • Question ID: CQ-BOUNDARY-137
  • Decision statement: Confirm disposition for CQ-BOUNDARY-137 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0098
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-056

  • Question ID: CQ-BOUNDARY-138
  • Decision statement: Confirm disposition for CQ-BOUNDARY-138 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0105
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-057

  • Question ID: CQ-BOUNDARY-139
  • Decision statement: Confirm disposition for CQ-BOUNDARY-139 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0109
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-058

  • Question ID: CQ-BOUNDARY-14
  • Decision statement: Confirm disposition for CQ-BOUNDARY-14 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0157
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-059

  • Question ID: CQ-BOUNDARY-140
  • Decision statement: Confirm disposition for CQ-BOUNDARY-140 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0111
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-060

  • Question ID: CQ-BOUNDARY-141
  • Decision statement: Confirm disposition for CQ-BOUNDARY-141 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0115
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-061

  • Question ID: CQ-BOUNDARY-142
  • Decision statement: Confirm disposition for CQ-BOUNDARY-142 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0118
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-062

  • Question ID: CQ-BOUNDARY-143
  • Decision statement: Confirm disposition for CQ-BOUNDARY-143 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0119
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-063

  • Question ID: CQ-BOUNDARY-144
  • Decision statement: Confirm disposition for CQ-BOUNDARY-144 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0120
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-064

  • Question ID: CQ-BOUNDARY-145
  • Decision statement: Confirm disposition for CQ-BOUNDARY-145 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0121
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-065

  • Question ID: CQ-BOUNDARY-146
  • Decision statement: Confirm disposition for CQ-BOUNDARY-146 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0122
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-066

  • Question ID: CQ-BOUNDARY-147
  • Decision statement: Confirm disposition for CQ-BOUNDARY-147 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0123
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-067

  • Question ID: CQ-BOUNDARY-148
  • Decision statement: Confirm disposition for CQ-BOUNDARY-148 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0124
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-068

  • Question ID: CQ-BOUNDARY-149
  • Decision statement: Confirm disposition for CQ-BOUNDARY-149 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0125
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-069

  • Question ID: CQ-BOUNDARY-15
  • Decision statement: Confirm disposition for CQ-BOUNDARY-15 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0158
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-070

  • Question ID: CQ-BOUNDARY-150
  • Decision statement: Confirm disposition for CQ-BOUNDARY-150 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0126
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-071

  • Question ID: CQ-BOUNDARY-151
  • Decision statement: Confirm disposition for CQ-BOUNDARY-151 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0127
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-072

  • Question ID: CQ-BOUNDARY-152
  • Decision statement: Confirm disposition for CQ-BOUNDARY-152 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0143
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-073

  • Question ID: CQ-BOUNDARY-153
  • Decision statement: Confirm disposition for CQ-BOUNDARY-153 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0151
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-074

  • Question ID: CQ-BOUNDARY-154
  • Decision statement: Confirm disposition for CQ-BOUNDARY-154 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0173
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-075

  • Question ID: CQ-BOUNDARY-155
  • Decision statement: Confirm disposition for CQ-BOUNDARY-155 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0181
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-076

  • Question ID: CQ-BOUNDARY-156
  • Decision statement: Confirm disposition for CQ-BOUNDARY-156 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0221
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-077

  • Question ID: CQ-BOUNDARY-157
  • Decision statement: Confirm disposition for CQ-BOUNDARY-157 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0240
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-078

  • Question ID: CQ-BOUNDARY-159
  • Decision statement: Confirm disposition for CQ-BOUNDARY-159 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0299
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-079

  • Question ID: CQ-BOUNDARY-16
  • Decision statement: Confirm disposition for CQ-BOUNDARY-16 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0197
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-080

  • Question ID: CQ-BOUNDARY-160
  • Decision statement: Confirm disposition for CQ-BOUNDARY-160 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0326
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-081

  • Question ID: CQ-BOUNDARY-161
  • Decision statement: Confirm disposition for CQ-BOUNDARY-161 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0344
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-082

  • Question ID: CQ-BOUNDARY-162
  • Decision statement: Confirm disposition for CQ-BOUNDARY-162 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0361
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-083

  • Question ID: CQ-BOUNDARY-163
  • Decision statement: Confirm disposition for CQ-BOUNDARY-163 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0419
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-084

  • Question ID: CQ-BOUNDARY-164
  • Decision statement: Confirm disposition for CQ-BOUNDARY-164 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0001
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-085

  • Question ID: CQ-BOUNDARY-165
  • Decision statement: Confirm disposition for CQ-BOUNDARY-165 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0005
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-086

  • Question ID: CQ-BOUNDARY-166
  • Decision statement: Confirm disposition for CQ-BOUNDARY-166 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0007
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-087

  • Question ID: CQ-BOUNDARY-167
  • Decision statement: Confirm disposition for CQ-BOUNDARY-167 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0008
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-088

  • Question ID: CQ-BOUNDARY-168
  • Decision statement: Confirm disposition for CQ-BOUNDARY-168 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0009
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-089

  • Question ID: CQ-BOUNDARY-169
  • Decision statement: Confirm disposition for CQ-BOUNDARY-169 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0010
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-090

  • Question ID: CQ-BOUNDARY-17
  • Decision statement: Confirm disposition for CQ-BOUNDARY-17 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0222
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-091

  • Question ID: CQ-BOUNDARY-170
  • Decision statement: Confirm disposition for CQ-BOUNDARY-170 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0012
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-092

  • Question ID: CQ-BOUNDARY-171
  • Decision statement: Confirm disposition for CQ-BOUNDARY-171 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0013
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-093

  • Question ID: CQ-BOUNDARY-172
  • Decision statement: Confirm disposition for CQ-BOUNDARY-172 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0021
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-094

  • Question ID: CQ-BOUNDARY-173
  • Decision statement: Confirm disposition for CQ-BOUNDARY-173 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0022
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-095

  • Question ID: CQ-BOUNDARY-174
  • Decision statement: Confirm disposition for CQ-BOUNDARY-174 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0025
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-096

  • Question ID: CQ-BOUNDARY-175
  • Decision statement: Confirm disposition for CQ-BOUNDARY-175 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0027
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-097

  • Question ID: CQ-BOUNDARY-176
  • Decision statement: Confirm disposition for CQ-BOUNDARY-176 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0029
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-098

  • Question ID: CQ-BOUNDARY-177
  • Decision statement: Confirm disposition for CQ-BOUNDARY-177 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0031
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-099

  • Question ID: CQ-BOUNDARY-178
  • Decision statement: Confirm disposition for CQ-BOUNDARY-178 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0038
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-100

  • Question ID: CQ-BOUNDARY-179
  • Decision statement: Confirm disposition for CQ-BOUNDARY-179 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0039
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-101

  • Question ID: CQ-BOUNDARY-18
  • Decision statement: Confirm disposition for CQ-BOUNDARY-18 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0223
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-102

  • Question ID: CQ-BOUNDARY-180
  • Decision statement: Confirm disposition for CQ-BOUNDARY-180 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0042
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-103

  • Question ID: CQ-BOUNDARY-181
  • Decision statement: Confirm disposition for CQ-BOUNDARY-181 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0043
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-104

  • Question ID: CQ-BOUNDARY-182
  • Decision statement: Confirm disposition for CQ-BOUNDARY-182 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0046
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-105

  • Question ID: CQ-BOUNDARY-183
  • Decision statement: Confirm disposition for CQ-BOUNDARY-183 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0047
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-106

  • Question ID: CQ-BOUNDARY-184
  • Decision statement: Confirm disposition for CQ-BOUNDARY-184 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0052
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-107

  • Question ID: CQ-BOUNDARY-185
  • Decision statement: Confirm disposition for CQ-BOUNDARY-185 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0056
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-108

  • Question ID: CQ-BOUNDARY-186
  • Decision statement: Confirm disposition for CQ-BOUNDARY-186 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0059
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-109

  • Question ID: CQ-BOUNDARY-187
  • Decision statement: Confirm disposition for CQ-BOUNDARY-187 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0061
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-110

  • Question ID: CQ-BOUNDARY-188
  • Decision statement: Confirm disposition for CQ-BOUNDARY-188 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0063
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-111

  • Question ID: CQ-BOUNDARY-189
  • Decision statement: Confirm disposition for CQ-BOUNDARY-189 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0069
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-112

  • Question ID: CQ-BOUNDARY-19
  • Decision statement: Confirm disposition for CQ-BOUNDARY-19 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0229
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-113

  • Question ID: CQ-BOUNDARY-190
  • Decision statement: Confirm disposition for CQ-BOUNDARY-190 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0070
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-114

  • Question ID: CQ-BOUNDARY-191
  • Decision statement: Confirm disposition for CQ-BOUNDARY-191 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0072
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-115

  • Question ID: CQ-BOUNDARY-192
  • Decision statement: Confirm disposition for CQ-BOUNDARY-192 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0090
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-116

  • Question ID: CQ-BOUNDARY-193
  • Decision statement: Confirm disposition for CQ-BOUNDARY-193 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS154-0001
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-117

  • Question ID: CQ-BOUNDARY-194
  • Decision statement: Confirm disposition for CQ-BOUNDARY-194 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS154-0005
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-118

  • Question ID: CQ-BOUNDARY-195
  • Decision statement: Confirm disposition for CQ-BOUNDARY-195 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS154-0007
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-119

  • Question ID: CQ-BOUNDARY-196
  • Decision statement: Confirm disposition for CQ-BOUNDARY-196 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS154-0028
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-120

  • Question ID: CQ-BOUNDARY-197
  • Decision statement: Confirm disposition for CQ-BOUNDARY-197 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS154-0030
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-121

  • Question ID: CQ-BOUNDARY-198
  • Decision statement: Confirm disposition for CQ-BOUNDARY-198 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS154-0033
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-122

  • Question ID: CQ-BOUNDARY-20
  • Decision statement: Confirm disposition for CQ-BOUNDARY-20 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0234
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-123

  • Question ID: CQ-BOUNDARY-200
  • Decision statement: Confirm disposition for CQ-BOUNDARY-200 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0002
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-124

  • Question ID: CQ-BOUNDARY-202
  • Decision statement: Confirm disposition for CQ-BOUNDARY-202 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0013
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-125

  • Question ID: CQ-BOUNDARY-203
  • Decision statement: Confirm disposition for CQ-BOUNDARY-203 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0023
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-126

  • Question ID: CQ-BOUNDARY-204
  • Decision statement: Confirm disposition for CQ-BOUNDARY-204 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0032
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-127

  • Question ID: CQ-BOUNDARY-205
  • Decision statement: Confirm disposition for CQ-BOUNDARY-205 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0035
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-128

  • Question ID: CQ-BOUNDARY-206
  • Decision statement: Confirm disposition for CQ-BOUNDARY-206 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0039
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-129

  • Question ID: CQ-BOUNDARY-207
  • Decision statement: Confirm disposition for CQ-BOUNDARY-207 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0050
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-130

  • Question ID: CQ-BOUNDARY-208
  • Decision statement: Confirm disposition for CQ-BOUNDARY-208 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0052
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-131

  • Question ID: CQ-BOUNDARY-209
  • Decision statement: Confirm disposition for CQ-BOUNDARY-209 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0053
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-132

  • Question ID: CQ-BOUNDARY-21
  • Decision statement: Confirm disposition for CQ-BOUNDARY-21 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0235
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-133

  • Question ID: CQ-BOUNDARY-210
  • Decision statement: Confirm disposition for CQ-BOUNDARY-210 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0064
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-134

  • Question ID: CQ-BOUNDARY-211
  • Decision statement: Confirm disposition for CQ-BOUNDARY-211 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0085
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-135

  • Question ID: CQ-BOUNDARY-212
  • Decision statement: Confirm disposition for CQ-BOUNDARY-212 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0086
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-136

  • Question ID: CQ-BOUNDARY-213
  • Decision statement: Confirm disposition for CQ-BOUNDARY-213 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0092
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-137

  • Question ID: CQ-BOUNDARY-214
  • Decision statement: Confirm disposition for CQ-BOUNDARY-214 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0107
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-138

  • Question ID: CQ-BOUNDARY-215
  • Decision statement: Confirm disposition for CQ-BOUNDARY-215 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0112
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-139

  • Question ID: CQ-BOUNDARY-216
  • Decision statement: Confirm disposition for CQ-BOUNDARY-216 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0115
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-140

  • Question ID: CQ-BOUNDARY-217
  • Decision statement: Confirm disposition for CQ-BOUNDARY-217 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0123
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-141

  • Question ID: CQ-BOUNDARY-218
  • Decision statement: Confirm disposition for CQ-BOUNDARY-218 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0126
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-142

  • Question ID: CQ-BOUNDARY-219
  • Decision statement: Confirm disposition for CQ-BOUNDARY-219 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0131
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-143

  • Question ID: CQ-BOUNDARY-22
  • Decision statement: Confirm disposition for CQ-BOUNDARY-22 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0238
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-144

  • Question ID: CQ-BOUNDARY-220
  • Decision statement: Confirm disposition for CQ-BOUNDARY-220 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0132
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-145

  • Question ID: CQ-BOUNDARY-221
  • Decision statement: Confirm disposition for CQ-BOUNDARY-221 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0135
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-146

  • Question ID: CQ-BOUNDARY-222
  • Decision statement: Confirm disposition for CQ-BOUNDARY-222 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0136
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-147

  • Question ID: CQ-BOUNDARY-223
  • Decision statement: Confirm disposition for CQ-BOUNDARY-223 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0139
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-148

  • Question ID: CQ-BOUNDARY-224
  • Decision statement: Confirm disposition for CQ-BOUNDARY-224 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0140
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-149

  • Question ID: CQ-BOUNDARY-225
  • Decision statement: Confirm disposition for CQ-BOUNDARY-225 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0229
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-150

  • Question ID: CQ-BOUNDARY-226
  • Decision statement: Confirm disposition for CQ-BOUNDARY-226 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0230
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-151

  • Question ID: CQ-BOUNDARY-227
  • Decision statement: Confirm disposition for CQ-BOUNDARY-227 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0244
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-152

  • Question ID: CQ-BOUNDARY-228
  • Decision statement: Confirm disposition for CQ-BOUNDARY-228 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0245
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-153

  • Question ID: CQ-BOUNDARY-229
  • Decision statement: Confirm disposition for CQ-BOUNDARY-229 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0254
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-154

  • Question ID: CQ-BOUNDARY-23
  • Decision statement: Confirm disposition for CQ-BOUNDARY-23 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0240
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-155

  • Question ID: CQ-BOUNDARY-230
  • Decision statement: Confirm disposition for CQ-BOUNDARY-230 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0002
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-156

  • Question ID: CQ-BOUNDARY-231
  • Decision statement: Confirm disposition for CQ-BOUNDARY-231 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0005
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-157

  • Question ID: CQ-BOUNDARY-232
  • Decision statement: Confirm disposition for CQ-BOUNDARY-232 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0006
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-158

  • Question ID: CQ-BOUNDARY-233
  • Decision statement: Confirm disposition for CQ-BOUNDARY-233 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0013
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-159

  • Question ID: CQ-BOUNDARY-234
  • Decision statement: Confirm disposition for CQ-BOUNDARY-234 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0015
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-160

  • Question ID: CQ-BOUNDARY-235
  • Decision statement: Confirm disposition for CQ-BOUNDARY-235 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0045
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-161

  • Question ID: CQ-BOUNDARY-236
  • Decision statement: Confirm disposition for CQ-BOUNDARY-236 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0049
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-162

  • Question ID: CQ-BOUNDARY-237
  • Decision statement: Confirm disposition for CQ-BOUNDARY-237 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0050
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-163

  • Question ID: CQ-BOUNDARY-238
  • Decision statement: Confirm disposition for CQ-BOUNDARY-238 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0052
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-164

  • Question ID: CQ-BOUNDARY-239
  • Decision statement: Confirm disposition for CQ-BOUNDARY-239 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0062
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-165

  • Question ID: CQ-BOUNDARY-24
  • Decision statement: Confirm disposition for CQ-BOUNDARY-24 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0241
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-166

  • Question ID: CQ-BOUNDARY-240
  • Decision statement: Confirm disposition for CQ-BOUNDARY-240 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0086
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-167

  • Question ID: CQ-BOUNDARY-241
  • Decision statement: Confirm disposition for CQ-BOUNDARY-241 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0112
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-168

  • Question ID: CQ-BOUNDARY-242
  • Decision statement: Confirm disposition for CQ-BOUNDARY-242 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0114
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-169

  • Question ID: CQ-BOUNDARY-243
  • Decision statement: Confirm disposition for CQ-BOUNDARY-243 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0117
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-170

  • Question ID: CQ-BOUNDARY-244
  • Decision statement: Confirm disposition for CQ-BOUNDARY-244 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0138
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-171

  • Question ID: CQ-BOUNDARY-25
  • Decision statement: Confirm disposition for CQ-BOUNDARY-25 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0242
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-172

  • Question ID: CQ-BOUNDARY-26
  • Decision statement: Confirm disposition for CQ-BOUNDARY-26 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0246
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-173

  • Question ID: CQ-BOUNDARY-27
  • Decision statement: Confirm disposition for CQ-BOUNDARY-27 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0247
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-174

  • Question ID: CQ-BOUNDARY-28
  • Decision statement: Confirm disposition for CQ-BOUNDARY-28 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0248
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-175

  • Question ID: CQ-BOUNDARY-29
  • Decision statement: Confirm disposition for CQ-BOUNDARY-29 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0250
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-176

  • Question ID: CQ-BOUNDARY-30
  • Decision statement: Confirm disposition for CQ-BOUNDARY-30 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0251
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-177

  • Question ID: CQ-BOUNDARY-31
  • Decision statement: Confirm disposition for CQ-BOUNDARY-31 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0257
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-178

  • Question ID: CQ-BOUNDARY-32
  • Decision statement: Confirm disposition for CQ-BOUNDARY-32 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0266
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-179

  • Question ID: CQ-BOUNDARY-33
  • Decision statement: Confirm disposition for CQ-BOUNDARY-33 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0267
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-180

  • Question ID: CQ-BOUNDARY-34
  • Decision statement: Confirm disposition for CQ-BOUNDARY-34 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0268
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-181

  • Question ID: CQ-BOUNDARY-35
  • Decision statement: Confirm disposition for CQ-BOUNDARY-35 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0269
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-182

  • Question ID: CQ-BOUNDARY-36
  • Decision statement: Confirm disposition for CQ-BOUNDARY-36 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0270
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-183

  • Question ID: CQ-BOUNDARY-37
  • Decision statement: Confirm disposition for CQ-BOUNDARY-37 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0271
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-184

  • Question ID: CQ-BOUNDARY-38
  • Decision statement: Confirm disposition for CQ-BOUNDARY-38 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0272
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-185

  • Question ID: CQ-BOUNDARY-39
  • Decision statement: Confirm disposition for CQ-BOUNDARY-39 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0273
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-186

  • Question ID: CQ-BOUNDARY-40
  • Decision statement: Confirm disposition for CQ-BOUNDARY-40 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0274
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-187

  • Question ID: CQ-BOUNDARY-41
  • Decision statement: Confirm disposition for CQ-BOUNDARY-41 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0275
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-188

  • Question ID: CQ-BOUNDARY-42
  • Decision statement: Confirm disposition for CQ-BOUNDARY-42 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0276
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-189

  • Question ID: CQ-BOUNDARY-43
  • Decision statement: Confirm disposition for CQ-BOUNDARY-43 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0277
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-190

  • Question ID: CQ-BOUNDARY-44
  • Decision statement: Confirm disposition for CQ-BOUNDARY-44 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0278
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-191

  • Question ID: CQ-BOUNDARY-45
  • Decision statement: Confirm disposition for CQ-BOUNDARY-45 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0284
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-192

  • Question ID: CQ-BOUNDARY-46
  • Decision statement: Confirm disposition for CQ-BOUNDARY-46 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0301
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-193

  • Question ID: CQ-BOUNDARY-47
  • Decision statement: Confirm disposition for CQ-BOUNDARY-47 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0309
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-194

  • Question ID: CQ-BOUNDARY-48
  • Decision statement: Confirm disposition for CQ-BOUNDARY-48 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0001
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-195

  • Question ID: CQ-BOUNDARY-49
  • Decision statement: Confirm disposition for CQ-BOUNDARY-49 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0005
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-196

  • Question ID: CQ-BOUNDARY-50
  • Decision statement: Confirm disposition for CQ-BOUNDARY-50 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0006
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-197

  • Question ID: CQ-BOUNDARY-51
  • Decision statement: Confirm disposition for CQ-BOUNDARY-51 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0007
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-198

  • Question ID: CQ-BOUNDARY-52
  • Decision statement: Confirm disposition for CQ-BOUNDARY-52 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0009
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-199

  • Question ID: CQ-BOUNDARY-53
  • Decision statement: Confirm disposition for CQ-BOUNDARY-53 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0012
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-200

  • Question ID: CQ-BOUNDARY-54
  • Decision statement: Confirm disposition for CQ-BOUNDARY-54 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0015
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-201

  • Question ID: CQ-BOUNDARY-55
  • Decision statement: Confirm disposition for CQ-BOUNDARY-55 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0016
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-202

  • Question ID: CQ-BOUNDARY-56
  • Decision statement: Confirm disposition for CQ-BOUNDARY-56 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0017
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-203

  • Question ID: CQ-BOUNDARY-57
  • Decision statement: Confirm disposition for CQ-BOUNDARY-57 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0025
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-204

  • Question ID: CQ-BOUNDARY-58
  • Decision statement: Confirm disposition for CQ-BOUNDARY-58 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0027
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-205

  • Question ID: CQ-BOUNDARY-59
  • Decision statement: Confirm disposition for CQ-BOUNDARY-59 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0033
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-206

  • Question ID: CQ-BOUNDARY-60
  • Decision statement: Confirm disposition for CQ-BOUNDARY-60 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0045
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-207

  • Question ID: CQ-BOUNDARY-61
  • Decision statement: Confirm disposition for CQ-BOUNDARY-61 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0054
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-208

  • Question ID: CQ-BOUNDARY-62
  • Decision statement: Confirm disposition for CQ-BOUNDARY-62 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0060
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-209

  • Question ID: CQ-BOUNDARY-63
  • Decision statement: Confirm disposition for CQ-BOUNDARY-63 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0063
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-210

  • Question ID: CQ-BOUNDARY-64
  • Decision statement: Confirm disposition for CQ-BOUNDARY-64 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0073
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-211

  • Question ID: CQ-BOUNDARY-65
  • Decision statement: Confirm disposition for CQ-BOUNDARY-65 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0074
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-212

  • Question ID: CQ-BOUNDARY-66
  • Decision statement: Confirm disposition for CQ-BOUNDARY-66 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0080
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-213

  • Question ID: CQ-BOUNDARY-67
  • Decision statement: Confirm disposition for CQ-BOUNDARY-67 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0081
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-214

  • Question ID: CQ-BOUNDARY-68
  • Decision statement: Confirm disposition for CQ-BOUNDARY-68 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0082
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-215

  • Question ID: CQ-BOUNDARY-69
  • Decision statement: Confirm disposition for CQ-BOUNDARY-69 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0084
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-216

  • Question ID: CQ-BOUNDARY-70
  • Decision statement: Confirm disposition for CQ-BOUNDARY-70 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0086
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-217

  • Question ID: CQ-BOUNDARY-71
  • Decision statement: Confirm disposition for CQ-BOUNDARY-71 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0087
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-218

  • Question ID: CQ-BOUNDARY-72
  • Decision statement: Confirm disposition for CQ-BOUNDARY-72 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0089
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-219

  • Question ID: CQ-BOUNDARY-73
  • Decision statement: Confirm disposition for CQ-BOUNDARY-73 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0090
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-220

  • Question ID: CQ-BOUNDARY-74
  • Decision statement: Confirm disposition for CQ-BOUNDARY-74 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0091
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-221

  • Question ID: CQ-BOUNDARY-75
  • Decision statement: Confirm disposition for CQ-BOUNDARY-75 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0096
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-222

  • Question ID: CQ-BOUNDARY-76
  • Decision statement: Confirm disposition for CQ-BOUNDARY-76 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0098
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-223

  • Question ID: CQ-BOUNDARY-77
  • Decision statement: Confirm disposition for CQ-BOUNDARY-77 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0099
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-224

  • Question ID: CQ-BOUNDARY-78
  • Decision statement: Confirm disposition for CQ-BOUNDARY-78 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0100
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-225

  • Question ID: CQ-BOUNDARY-79
  • Decision statement: Confirm disposition for CQ-BOUNDARY-79 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0101
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-226

  • Question ID: CQ-BOUNDARY-80
  • Decision statement: Confirm disposition for CQ-BOUNDARY-80 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0102
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-227

  • Question ID: CQ-BOUNDARY-81
  • Decision statement: Confirm disposition for CQ-BOUNDARY-81 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0103
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-228

  • Question ID: CQ-BOUNDARY-82
  • Decision statement: Confirm disposition for CQ-BOUNDARY-82 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0104
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-229

  • Question ID: CQ-BOUNDARY-83
  • Decision statement: Confirm disposition for CQ-BOUNDARY-83 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0106
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-230

  • Question ID: CQ-BOUNDARY-84
  • Decision statement: Confirm disposition for CQ-BOUNDARY-84 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0107
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-231

  • Question ID: CQ-BOUNDARY-85
  • Decision statement: Confirm disposition for CQ-BOUNDARY-85 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0108
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-232

  • Question ID: CQ-BOUNDARY-86
  • Decision statement: Confirm disposition for CQ-BOUNDARY-86 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0111
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-233

  • Question ID: CQ-BOUNDARY-87
  • Decision statement: Confirm disposition for CQ-BOUNDARY-87 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0113
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-234

  • Question ID: CQ-BOUNDARY-88
  • Decision statement: Confirm disposition for CQ-BOUNDARY-88 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0115
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-235

  • Question ID: CQ-BOUNDARY-89
  • Decision statement: Confirm disposition for CQ-BOUNDARY-89 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0116
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-236

  • Question ID: CQ-BOUNDARY-90
  • Decision statement: Confirm disposition for CQ-BOUNDARY-90 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0117
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-237

  • Question ID: CQ-BOUNDARY-91
  • Decision statement: Confirm disposition for CQ-BOUNDARY-91 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0118
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-238

  • Question ID: CQ-BOUNDARY-92
  • Decision statement: Confirm disposition for CQ-BOUNDARY-92 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0122
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-239

  • Question ID: CQ-BOUNDARY-93
  • Decision statement: Confirm disposition for CQ-BOUNDARY-93 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0129
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-240

  • Question ID: CQ-BOUNDARY-94
  • Decision statement: Confirm disposition for CQ-BOUNDARY-94 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0130
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-241

  • Question ID: CQ-BOUNDARY-95
  • Decision statement: Confirm disposition for CQ-BOUNDARY-95 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0131
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-242

  • Question ID: CQ-BOUNDARY-96
  • Decision statement: Confirm disposition for CQ-BOUNDARY-96 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0132
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-243

  • Question ID: CQ-BOUNDARY-97
  • Decision statement: Confirm disposition for CQ-BOUNDARY-97 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0133
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-244

  • Question ID: CQ-BOUNDARY-98
  • Decision statement: Confirm disposition for CQ-BOUNDARY-98 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0139
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-245

  • Question ID: CQ-BOUNDARY-99
  • Decision statement: Confirm disposition for CQ-BOUNDARY-99 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0143
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: System boundary / item definition
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-246

  • Question ID: CQ-INTERFACE-01
  • Decision statement: Confirm disposition for CQ-INTERFACE-01 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0005
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-247

  • Question ID: CQ-INTERFACE-02
  • Decision statement: Confirm disposition for CQ-INTERFACE-02 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0006
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-248

  • Question ID: CQ-INTERFACE-03
  • Decision statement: Confirm disposition for CQ-INTERFACE-03 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0023
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-249

  • Question ID: CQ-INTERFACE-04
  • Decision statement: Confirm disposition for CQ-INTERFACE-04 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0053
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-250

  • Question ID: CQ-INTERFACE-05
  • Decision statement: Confirm disposition for CQ-INTERFACE-05 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0080
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-251

  • Question ID: CQ-INTERFACE-06
  • Decision statement: Confirm disposition for CQ-INTERFACE-06 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0173
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-252

  • Question ID: CQ-INTERFACE-07
  • Decision statement: Confirm disposition for CQ-INTERFACE-07 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0008
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-253

  • Question ID: CQ-INTERFACE-08
  • Decision statement: Confirm disposition for CQ-INTERFACE-08 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0085
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-254

  • Question ID: CQ-INTERFACE-09
  • Decision statement: Confirm disposition for CQ-INTERFACE-09 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0280
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-255

  • Question ID: CQ-INTERFACE-10
  • Decision statement: Confirm disposition for CQ-INTERFACE-10 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0293
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-256

  • Question ID: CQ-INTERFACE-11
  • Decision statement: Confirm disposition for CQ-INTERFACE-11 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0346
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-257

  • Question ID: CQ-INTERFACE-12
  • Decision statement: Confirm disposition for CQ-INTERFACE-12 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0102
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-258

  • Question ID: CQ-INTERFACE-13
  • Decision statement: Confirm disposition for CQ-INTERFACE-13 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0194
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-259

  • Question ID: CQ-INTERFACE-14
  • Decision statement: Confirm disposition for CQ-INTERFACE-14 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0301
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-260

  • Question ID: CQ-INTERFACE-15
  • Decision statement: Confirm disposition for CQ-INTERFACE-15 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0357
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-261

  • Question ID: CQ-INTERFACE-16
  • Decision statement: Confirm disposition for CQ-INTERFACE-16 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0015
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-262

  • Question ID: CQ-INTERFACE-17
  • Decision statement: Confirm disposition for CQ-INTERFACE-17 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0064
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-263

  • Question ID: CQ-INTERFACE-18
  • Decision statement: Confirm disposition for CQ-INTERFACE-18 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0069
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-264

  • Question ID: CQ-INTERFACE-19
  • Decision statement: Confirm disposition for CQ-INTERFACE-19 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0072
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-265

  • Question ID: CQ-INTERFACE-20
  • Decision statement: Confirm disposition for CQ-INTERFACE-20 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0010
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-266

  • Question ID: CQ-INTERFACE-21
  • Decision statement: Confirm disposition for CQ-INTERFACE-21 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0011
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-267

  • Question ID: CQ-INTERFACE-22
  • Decision statement: Confirm disposition for CQ-INTERFACE-22 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0018
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-268

  • Question ID: CQ-INTERFACE-23
  • Decision statement: Confirm disposition for CQ-INTERFACE-23 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0022
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-269

  • Question ID: CQ-INTERFACE-24
  • Decision statement: Confirm disposition for CQ-INTERFACE-24 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0023
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-270

  • Question ID: CQ-INTERFACE-25
  • Decision statement: Confirm disposition for CQ-INTERFACE-25 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0024
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-271

  • Question ID: CQ-INTERFACE-26
  • Decision statement: Confirm disposition for CQ-INTERFACE-26 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0032
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-272

  • Question ID: CQ-INTERFACE-27
  • Decision statement: Confirm disposition for CQ-INTERFACE-27 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0034
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-273

  • Question ID: CQ-INTERFACE-28
  • Decision statement: Confirm disposition for CQ-INTERFACE-28 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0037
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-274

  • Question ID: CQ-INTERFACE-29
  • Decision statement: Confirm disposition for CQ-INTERFACE-29 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0038
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-275

  • Question ID: CQ-INTERFACE-30
  • Decision statement: Confirm disposition for CQ-INTERFACE-30 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0039
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-276

  • Question ID: CQ-INTERFACE-31
  • Decision statement: Confirm disposition for CQ-INTERFACE-31 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0041
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-277

  • Question ID: CQ-INTERFACE-32
  • Decision statement: Confirm disposition for CQ-INTERFACE-32 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0042
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-278

  • Question ID: CQ-INTERFACE-33
  • Decision statement: Confirm disposition for CQ-INTERFACE-33 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0043
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-279

  • Question ID: CQ-INTERFACE-34
  • Decision statement: Confirm disposition for CQ-INTERFACE-34 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0055
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-280

  • Question ID: CQ-INTERFACE-35
  • Decision statement: Confirm disposition for CQ-INTERFACE-35 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0060
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-281

  • Question ID: CQ-INTERFACE-36
  • Decision statement: Confirm disposition for CQ-INTERFACE-36 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0061
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-282

  • Question ID: CQ-INTERFACE-37
  • Decision statement: Confirm disposition for CQ-INTERFACE-37 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0063
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-283

  • Question ID: CQ-INTERFACE-38
  • Decision statement: Confirm disposition for CQ-INTERFACE-38 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0067
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-284

  • Question ID: CQ-INTERFACE-39
  • Decision statement: Confirm disposition for CQ-INTERFACE-39 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0072
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-285

  • Question ID: CQ-INTERFACE-40
  • Decision statement: Confirm disposition for CQ-INTERFACE-40 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0087
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-286

  • Question ID: CQ-INTERFACE-41
  • Decision statement: Confirm disposition for CQ-INTERFACE-41 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0089
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-287

  • Question ID: CQ-INTERFACE-42
  • Decision statement: Confirm disposition for CQ-INTERFACE-42 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0090
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-288

  • Question ID: CQ-INTERFACE-43
  • Decision statement: Confirm disposition for CQ-INTERFACE-43 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0094
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-289

  • Question ID: CQ-INTERFACE-44
  • Decision statement: Confirm disposition for CQ-INTERFACE-44 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0097
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-290

  • Question ID: CQ-INTERFACE-45
  • Decision statement: Confirm disposition for CQ-INTERFACE-45 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0098
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-291

  • Question ID: CQ-INTERFACE-46
  • Decision statement: Confirm disposition for CQ-INTERFACE-46 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0113
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-292

  • Question ID: CQ-INTERFACE-47
  • Decision statement: Confirm disposition for CQ-INTERFACE-47 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0115
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-293

  • Question ID: CQ-INTERFACE-48
  • Decision statement: Confirm disposition for CQ-INTERFACE-48 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0116
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-294

  • Question ID: CQ-INTERFACE-49
  • Decision statement: Confirm disposition for CQ-INTERFACE-49 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0118
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-295

  • Question ID: CQ-INTERFACE-50
  • Decision statement: Confirm disposition for CQ-INTERFACE-50 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0127
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-296

  • Question ID: CQ-INTERFACE-51
  • Decision statement: Confirm disposition for CQ-INTERFACE-51 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0129
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-297

  • Question ID: CQ-INTERFACE-52
  • Decision statement: Confirm disposition for CQ-INTERFACE-52 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0132
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-298

  • Question ID: CQ-INTERFACE-53
  • Decision statement: Confirm disposition for CQ-INTERFACE-53 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0134
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-299

  • Question ID: CQ-INTERFACE-54
  • Decision statement: Confirm disposition for CQ-INTERFACE-54 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0135
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-300

  • Question ID: CQ-INTERFACE-55
  • Decision statement: Confirm disposition for CQ-INTERFACE-55 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0136
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-301

  • Question ID: CQ-INTERFACE-56
  • Decision statement: Confirm disposition for CQ-INTERFACE-56 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0137
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-302

  • Question ID: CQ-INTERFACE-57
  • Decision statement: Confirm disposition for CQ-INTERFACE-57 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0148
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-303

  • Question ID: CQ-INTERFACE-58
  • Decision statement: Confirm disposition for CQ-INTERFACE-58 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0149
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-304

  • Question ID: CQ-INTERFACE-59
  • Decision statement: Confirm disposition for CQ-INTERFACE-59 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0150
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-305

  • Question ID: CQ-INTERFACE-60
  • Decision statement: Confirm disposition for CQ-INTERFACE-60 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0153
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-306

  • Question ID: CQ-INTERFACE-61
  • Decision statement: Confirm disposition for CQ-INTERFACE-61 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0165
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-307

  • Question ID: CQ-INTERFACE-62
  • Decision statement: Confirm disposition for CQ-INTERFACE-62 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0169
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-308

  • Question ID: CQ-INTERFACE-63
  • Decision statement: Confirm disposition for CQ-INTERFACE-63 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0170
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-309

  • Question ID: CQ-INTERFACE-64
  • Decision statement: Confirm disposition for CQ-INTERFACE-64 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0171
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-310

  • Question ID: CQ-INTERFACE-65
  • Decision statement: Confirm disposition for CQ-INTERFACE-65 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0181
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-311

  • Question ID: CQ-INTERFACE-66
  • Decision statement: Confirm disposition for CQ-INTERFACE-66 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0187
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-312

  • Question ID: CQ-INTERFACE-67
  • Decision statement: Confirm disposition for CQ-INTERFACE-67 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0200
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-313

  • Question ID: CQ-INTERFACE-68
  • Decision statement: Confirm disposition for CQ-INTERFACE-68 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0202
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-314

  • Question ID: CQ-INTERFACE-69
  • Decision statement: Confirm disposition for CQ-INTERFACE-69 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0203
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: External Interfaces / vehicle network boundary
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-315

  • Question ID: CQ-HSM-01
  • Decision statement: Confirm disposition for CQ-HSM-01 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Supplier
  • Affected Related requirements: RFQX-3299216-1-0147
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Hardware Platform / Secure Boot and Platform Integrity
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-316

  • Question ID: CQ-HSM-02
  • Decision statement: Confirm disposition for CQ-HSM-02 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Supplier
  • Affected Related requirements: RFQX-CVS123-2-0127
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Hardware Platform / Secure Boot and Platform Integrity
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-317

  • Question ID: CQ-HSM-03
  • Decision statement: Confirm disposition for CQ-HSM-03 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Supplier
  • Affected Related requirements: RFQX-CVS123-2-0145
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Hardware Platform / Secure Boot and Platform Integrity
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-318

  • Question ID: CQ-HSM-04
  • Decision statement: Confirm disposition for CQ-HSM-04 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Supplier
  • Affected Related requirements: RFQX-CVS123-2-0202
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Hardware Platform / Secure Boot and Platform Integrity
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-319

  • Question ID: CQ-HSM-05
  • Decision statement: Confirm disposition for CQ-HSM-05 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Supplier
  • Affected Related requirements: RFQX-CVS123-2-0257
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Hardware Platform / Secure Boot and Platform Integrity
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-320

  • Question ID: CQ-HSM-06
  • Decision statement: Confirm disposition for CQ-HSM-06 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Supplier
  • Affected Related requirements: RFQX-CVS123-2-0315
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Hardware Platform / Secure Boot and Platform Integrity
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-321

  • Question ID: CQ-HSM-07
  • Decision statement: Confirm disposition for CQ-HSM-07 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Supplier
  • Affected Related requirements: RFQX-CVS123-2-0332
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Hardware Platform / Secure Boot and Platform Integrity
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-322

  • Question ID: CQ-HSM-08
  • Decision statement: Confirm disposition for CQ-HSM-08 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Supplier
  • Affected Related requirements: RFQX-CVS123-2-0348
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Hardware Platform / Secure Boot and Platform Integrity
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-323

  • Question ID: CQ-LOG-01
  • Decision statement: Confirm disposition for CQ-LOG-01 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0076
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Logging and Audit / Security Monitoring
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-324

  • Question ID: CQ-DIAG-01
  • Decision statement: Confirm disposition for CQ-DIAG-01 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0013
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-325

  • Question ID: CQ-DIAG-02
  • Decision statement: Confirm disposition for CQ-DIAG-02 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0026
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-326

  • Question ID: CQ-DIAG-03
  • Decision statement: Confirm disposition for CQ-DIAG-03 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0088
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-327

  • Question ID: CQ-DIAG-04
  • Decision statement: Confirm disposition for CQ-DIAG-04 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0092
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-328

  • Question ID: CQ-DIAG-05
  • Decision statement: Confirm disposition for CQ-DIAG-05 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0097
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-329

  • Question ID: CQ-DIAG-06
  • Decision statement: Confirm disposition for CQ-DIAG-06 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0105
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-330

  • Question ID: CQ-DIAG-07
  • Decision statement: Confirm disposition for CQ-DIAG-07 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0123
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-331

  • Question ID: CQ-DIAG-08
  • Decision statement: Confirm disposition for CQ-DIAG-08 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0124
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-332

  • Question ID: CQ-DIAG-09
  • Decision statement: Confirm disposition for CQ-DIAG-09 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0126
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-333

  • Question ID: CQ-DIAG-10
  • Decision statement: Confirm disposition for CQ-DIAG-10 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0128
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-334

  • Question ID: CQ-DIAG-11
  • Decision statement: Confirm disposition for CQ-DIAG-11 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0136
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-335

  • Question ID: CQ-DIAG-12
  • Decision statement: Confirm disposition for CQ-DIAG-12 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0159
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-336

  • Question ID: CQ-DIAG-13
  • Decision statement: Confirm disposition for CQ-DIAG-13 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0231
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-337

  • Question ID: CQ-DIAG-14
  • Decision statement: Confirm disposition for CQ-DIAG-14 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0290
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-338

  • Question ID: CQ-DIAG-15
  • Decision statement: Confirm disposition for CQ-DIAG-15 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0022
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-339

  • Question ID: CQ-DIAG-16
  • Decision statement: Confirm disposition for CQ-DIAG-16 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0026
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-340

  • Question ID: CQ-DIAG-17
  • Decision statement: Confirm disposition for CQ-DIAG-17 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0035
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-341

  • Question ID: CQ-DIAG-18
  • Decision statement: Confirm disposition for CQ-DIAG-18 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0047
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-342

  • Question ID: CQ-DIAG-19
  • Decision statement: Confirm disposition for CQ-DIAG-19 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0052
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-343

  • Question ID: CQ-DIAG-20
  • Decision statement: Confirm disposition for CQ-DIAG-20 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0090
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-344

  • Question ID: CQ-DIAG-21
  • Decision statement: Confirm disposition for CQ-DIAG-21 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0091
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-345

  • Question ID: CQ-DIAG-22
  • Decision statement: Confirm disposition for CQ-DIAG-22 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0095
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-346

  • Question ID: CQ-DIAG-23
  • Decision statement: Confirm disposition for CQ-DIAG-23 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0096
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-347

  • Question ID: CQ-DIAG-24
  • Decision statement: Confirm disposition for CQ-DIAG-24 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0097
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-348

  • Question ID: CQ-DIAG-25
  • Decision statement: Confirm disposition for CQ-DIAG-25 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0099
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-349

  • Question ID: CQ-DIAG-26
  • Decision statement: Confirm disposition for CQ-DIAG-26 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0100
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-350

  • Question ID: CQ-DIAG-27
  • Decision statement: Confirm disposition for CQ-DIAG-27 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0101
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-351

  • Question ID: CQ-DIAG-28
  • Decision statement: Confirm disposition for CQ-DIAG-28 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0103
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-352

  • Question ID: CQ-DIAG-29
  • Decision statement: Confirm disposition for CQ-DIAG-29 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0106
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-353

  • Question ID: CQ-DIAG-30
  • Decision statement: Confirm disposition for CQ-DIAG-30 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0107
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-354

  • Question ID: CQ-DIAG-31
  • Decision statement: Confirm disposition for CQ-DIAG-31 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0108
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-355

  • Question ID: CQ-DIAG-32
  • Decision statement: Confirm disposition for CQ-DIAG-32 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0110
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-356

  • Question ID: CQ-DIAG-33
  • Decision statement: Confirm disposition for CQ-DIAG-33 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0112
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-357

  • Question ID: CQ-DIAG-34
  • Decision statement: Confirm disposition for CQ-DIAG-34 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0113
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-358

  • Question ID: CQ-DIAG-35
  • Decision statement: Confirm disposition for CQ-DIAG-35 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0114
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-359

  • Question ID: CQ-DIAG-36
  • Decision statement: Confirm disposition for CQ-DIAG-36 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0116
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-360

  • Question ID: CQ-DIAG-37
  • Decision statement: Confirm disposition for CQ-DIAG-37 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0136
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-361

  • Question ID: CQ-DIAG-38
  • Decision statement: Confirm disposition for CQ-DIAG-38 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0170
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-362

  • Question ID: CQ-DIAG-39
  • Decision statement: Confirm disposition for CQ-DIAG-39 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0188
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-363

  • Question ID: CQ-DIAG-40
  • Decision statement: Confirm disposition for CQ-DIAG-40 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0189
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-364

  • Question ID: CQ-DIAG-41
  • Decision statement: Confirm disposition for CQ-DIAG-41 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0190
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-365

  • Question ID: CQ-DIAG-42
  • Decision statement: Confirm disposition for CQ-DIAG-42 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0191
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-366

  • Question ID: CQ-DIAG-43
  • Decision statement: Confirm disposition for CQ-DIAG-43 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0200
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-367

  • Question ID: CQ-DIAG-44
  • Decision statement: Confirm disposition for CQ-DIAG-44 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0208
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-368

  • Question ID: CQ-DIAG-45
  • Decision statement: Confirm disposition for CQ-DIAG-45 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0211
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-369

  • Question ID: CQ-DIAG-46
  • Decision statement: Confirm disposition for CQ-DIAG-46 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0214
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-370

  • Question ID: CQ-DIAG-47
  • Decision statement: Confirm disposition for CQ-DIAG-47 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0218
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-371

  • Question ID: CQ-DIAG-48
  • Decision statement: Confirm disposition for CQ-DIAG-48 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0231
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-372

  • Question ID: CQ-DIAG-49
  • Decision statement: Confirm disposition for CQ-DIAG-49 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0261
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-373

  • Question ID: CQ-DIAG-50
  • Decision statement: Confirm disposition for CQ-DIAG-50 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0262
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-374

  • Question ID: CQ-DIAG-51
  • Decision statement: Confirm disposition for CQ-DIAG-51 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0271
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-375

  • Question ID: CQ-DIAG-52
  • Decision statement: Confirm disposition for CQ-DIAG-52 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0286
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-376

  • Question ID: CQ-DIAG-53
  • Decision statement: Confirm disposition for CQ-DIAG-53 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0293
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-377

  • Question ID: CQ-DIAG-54
  • Decision statement: Confirm disposition for CQ-DIAG-54 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0342
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-378

  • Question ID: CQ-DIAG-55
  • Decision statement: Confirm disposition for CQ-DIAG-55 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0358
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-379

  • Question ID: CQ-DIAG-56
  • Decision statement: Confirm disposition for CQ-DIAG-56 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0359
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-380

  • Question ID: CQ-DIAG-57
  • Decision statement: Confirm disposition for CQ-DIAG-57 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0360
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-381

  • Question ID: CQ-DIAG-58
  • Decision statement: Confirm disposition for CQ-DIAG-58 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0363
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-382

  • Question ID: CQ-DIAG-59
  • Decision statement: Confirm disposition for CQ-DIAG-59 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0394
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-383

  • Question ID: CQ-DIAG-60
  • Decision statement: Confirm disposition for CQ-DIAG-60 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0395
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-384

  • Question ID: CQ-DIAG-61
  • Decision statement: Confirm disposition for CQ-DIAG-61 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0401
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-385

  • Question ID: CQ-DIAG-62
  • Decision statement: Confirm disposition for CQ-DIAG-62 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0411
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-386

  • Question ID: CQ-DIAG-63
  • Decision statement: Confirm disposition for CQ-DIAG-63 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0413
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-387

  • Question ID: CQ-DIAG-64
  • Decision statement: Confirm disposition for CQ-DIAG-64 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0422
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-388

  • Question ID: CQ-DIAG-65
  • Decision statement: Confirm disposition for CQ-DIAG-65 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0423
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-389

  • Question ID: CQ-DIAG-66
  • Decision statement: Confirm disposition for CQ-DIAG-66 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0424
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-390

  • Question ID: CQ-DIAG-67
  • Decision statement: Confirm disposition for CQ-DIAG-67 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0425
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-391

  • Question ID: CQ-DIAG-68
  • Decision statement: Confirm disposition for CQ-DIAG-68 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0426
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-392

  • Question ID: CQ-DIAG-69
  • Decision statement: Confirm disposition for CQ-DIAG-69 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0428
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-393

  • Question ID: CQ-DIAG-70
  • Decision statement: Confirm disposition for CQ-DIAG-70 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0429
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-394

  • Question ID: CQ-DIAG-71
  • Decision statement: Confirm disposition for CQ-DIAG-71 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0430
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-395

  • Question ID: CQ-DIAG-72
  • Decision statement: Confirm disposition for CQ-DIAG-72 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0451
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-396

  • Question ID: CQ-DIAG-73
  • Decision statement: Confirm disposition for CQ-DIAG-73 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0452
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-397

  • Question ID: CQ-DIAG-74
  • Decision statement: Confirm disposition for CQ-DIAG-74 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0454
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-398

  • Question ID: CQ-DIAG-75
  • Decision statement: Confirm disposition for CQ-DIAG-75 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0455
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-399

  • Question ID: CQ-DIAG-76
  • Decision statement: Confirm disposition for CQ-DIAG-76 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0456
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-400

  • Question ID: CQ-DIAG-77
  • Decision statement: Confirm disposition for CQ-DIAG-77 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0460
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-401

  • Question ID: CQ-DIAG-78
  • Decision statement: Confirm disposition for CQ-DIAG-78 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0461
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-402

  • Question ID: CQ-DIAG-79
  • Decision statement: Confirm disposition for CQ-DIAG-79 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS124-0465
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-403

  • Question ID: CQ-DIAG-80
  • Decision statement: Confirm disposition for CQ-DIAG-80 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0067
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-404

  • Question ID: CQ-DIAG-81
  • Decision statement: Confirm disposition for CQ-DIAG-81 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0077
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-405

  • Question ID: CQ-DIAG-82
  • Decision statement: Confirm disposition for CQ-DIAG-82 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0018
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-406

  • Question ID: CQ-DIAG-83
  • Decision statement: Confirm disposition for CQ-DIAG-83 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0044
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-407

  • Question ID: CQ-DIAG-84
  • Decision statement: Confirm disposition for CQ-DIAG-84 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0076
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-408

  • Question ID: CQ-DIAG-85
  • Decision statement: Confirm disposition for CQ-DIAG-85 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0116
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-409

  • Question ID: CQ-DIAG-86
  • Decision statement: Confirm disposition for CQ-DIAG-86 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0118
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-410

  • Question ID: CQ-DIAG-87
  • Decision statement: Confirm disposition for CQ-DIAG-87 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0129
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-411

  • Question ID: CQ-DIAG-88
  • Decision statement: Confirm disposition for CQ-DIAG-88 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0130
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-412

  • Question ID: CQ-DIAG-89
  • Decision statement: Confirm disposition for CQ-DIAG-89 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0144
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-413

  • Question ID: CQ-DIAG-90
  • Decision statement: Confirm disposition for CQ-DIAG-90 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0145
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-414

  • Question ID: CQ-DIAG-91
  • Decision statement: Confirm disposition for CQ-DIAG-91 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0159
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-415

  • Question ID: CQ-DIAG-92
  • Decision statement: Confirm disposition for CQ-DIAG-92 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0161
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-416

  • Question ID: CQ-DIAG-93
  • Decision statement: Confirm disposition for CQ-DIAG-93 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0249
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-417

  • Question ID: CQ-DIAG-94
  • Decision statement: Confirm disposition for CQ-DIAG-94 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS32-0017
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Diagnostic access boundary / Secure Diagnostics
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-418

  • Question ID: CQ-PKI-01
  • Decision statement: Confirm disposition for CQ-PKI-01 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0296
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Key and Certificate Management
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-419

  • Question ID: CQ-PKI-02
  • Decision statement: Confirm disposition for CQ-PKI-02 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0034
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Key and Certificate Management
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-420

  • Question ID: CQ-PKI-03
  • Decision statement: Confirm disposition for CQ-PKI-03 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0055
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Key and Certificate Management
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-421

  • Question ID: CQ-PKI-04
  • Decision statement: Confirm disposition for CQ-PKI-04 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0057
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Key and Certificate Management
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-422

  • Question ID: CQ-PKI-05
  • Decision statement: Confirm disposition for CQ-PKI-05 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0127
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Key and Certificate Management
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-423

  • Question ID: CQ-PKI-06
  • Decision statement: Confirm disposition for CQ-PKI-06 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0164
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Key and Certificate Management
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-424

  • Question ID: CQ-PKI-07
  • Decision statement: Confirm disposition for CQ-PKI-07 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0197
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Key and Certificate Management
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-425

  • Question ID: CQ-PKI-08
  • Decision statement: Confirm disposition for CQ-PKI-08 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0211
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Key and Certificate Management
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-426

  • Question ID: CQ-PKI-09
  • Decision statement: Confirm disposition for CQ-PKI-09 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0246
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Key and Certificate Management
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-427

  • Question ID: CQ-UPDATE-01
  • Decision statement: Confirm disposition for CQ-UPDATE-01 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0004
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-428

  • Question ID: CQ-UPDATE-02
  • Decision statement: Confirm disposition for CQ-UPDATE-02 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0076
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-429

  • Question ID: CQ-UPDATE-03
  • Decision statement: Confirm disposition for CQ-UPDATE-03 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0077
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-430

  • Question ID: CQ-UPDATE-04
  • Decision statement: Confirm disposition for CQ-UPDATE-04 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0083
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-431

  • Question ID: CQ-UPDATE-05
  • Decision statement: Confirm disposition for CQ-UPDATE-05 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0095
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-432

  • Question ID: CQ-UPDATE-06
  • Decision statement: Confirm disposition for CQ-UPDATE-06 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0109
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-433

  • Question ID: CQ-UPDATE-07
  • Decision statement: Confirm disposition for CQ-UPDATE-07 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0119
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-434

  • Question ID: CQ-UPDATE-08
  • Decision statement: Confirm disposition for CQ-UPDATE-08 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0120
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-435

  • Question ID: CQ-UPDATE-09
  • Decision statement: Confirm disposition for CQ-UPDATE-09 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0121
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-436

  • Question ID: CQ-UPDATE-10
  • Decision statement: Confirm disposition for CQ-UPDATE-10 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0134
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-437

  • Question ID: CQ-UPDATE-11
  • Decision statement: Confirm disposition for CQ-UPDATE-11 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0135
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-438

  • Question ID: CQ-UPDATE-12
  • Decision statement: Confirm disposition for CQ-UPDATE-12 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0163
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-439

  • Question ID: CQ-UPDATE-13
  • Decision statement: Confirm disposition for CQ-UPDATE-13 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0170
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-440

  • Question ID: CQ-UPDATE-14
  • Decision statement: Confirm disposition for CQ-UPDATE-14 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0270
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Secure update / IVD architecture
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-441

  • Question ID: CQ-BACKEND-01
  • Decision statement: Confirm disposition for CQ-BACKEND-01 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0226
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-442

  • Question ID: CQ-BACKEND-03
  • Decision statement: Confirm disposition for CQ-BACKEND-03 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0093
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-443

  • Question ID: CQ-BACKEND-04
  • Decision statement: Confirm disposition for CQ-BACKEND-04 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0125
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-444

  • Question ID: CQ-BACKEND-05
  • Decision statement: Confirm disposition for CQ-BACKEND-05 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0138
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-445

  • Question ID: CQ-BACKEND-06
  • Decision statement: Confirm disposition for CQ-BACKEND-06 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0141
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-446

  • Question ID: CQ-BACKEND-07
  • Decision statement: Confirm disposition for CQ-BACKEND-07 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0144
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-447

  • Question ID: CQ-BACKEND-08
  • Decision statement: Confirm disposition for CQ-BACKEND-08 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0148
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-448

  • Question ID: CQ-BACKEND-09
  • Decision statement: Confirm disposition for CQ-BACKEND-09 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0219
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-449

  • Question ID: CQ-BACKEND-10
  • Decision statement: Confirm disposition for CQ-BACKEND-10 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0248
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-450

  • Question ID: CQ-BACKEND-11
  • Decision statement: Confirm disposition for CQ-BACKEND-11 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0318
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-451

  • Question ID: CQ-BACKEND-12
  • Decision statement: Confirm disposition for CQ-BACKEND-12 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0321
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-452

  • Question ID: CQ-BACKEND-13
  • Decision statement: Confirm disposition for CQ-BACKEND-13 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0017
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-453

  • Question ID: CQ-BACKEND-14
  • Decision statement: Confirm disposition for CQ-BACKEND-14 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0024
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-454

  • Question ID: CQ-BACKEND-15
  • Decision statement: Confirm disposition for CQ-BACKEND-15 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS151-0026
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-455

  • Question ID: CQ-BACKEND-16
  • Decision statement: Confirm disposition for CQ-BACKEND-16 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS154-0022
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-456

  • Question ID: CQ-BACKEND-17
  • Decision statement: Confirm disposition for CQ-BACKEND-17 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS154-0023
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-457

  • Question ID: CQ-BACKEND-18
  • Decision statement: Confirm disposition for CQ-BACKEND-18 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0082
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-458

  • Question ID: CQ-BACKEND-19
  • Decision statement: Confirm disposition for CQ-BACKEND-19 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0091
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-459

  • Question ID: CQ-BACKEND-20
  • Decision statement: Confirm disposition for CQ-BACKEND-20 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0097
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-460

  • Question ID: CQ-BACKEND-21
  • Decision statement: Confirm disposition for CQ-BACKEND-21 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0108
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-461

  • Question ID: CQ-BACKEND-22
  • Decision statement: Confirm disposition for CQ-BACKEND-22 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0149
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-462

  • Question ID: CQ-BACKEND-23
  • Decision statement: Confirm disposition for CQ-BACKEND-23 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0150
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-463

  • Question ID: CQ-BACKEND-24
  • Decision statement: Confirm disposition for CQ-BACKEND-24 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS31-0243
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Backend and IT Systems / Security Operations
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-464

  • Question ID: CQ-OPS-01
  • Decision statement: Confirm disposition for CQ-OPS-01 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0020
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Operational and Lifecycle Capabilities
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-465

  • Question ID: CQ-EVIDENCE-01
  • Decision statement: Confirm disposition for CQ-EVIDENCE-01 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-3299216-1-0156
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Engineering Toolchain / Compliance Process
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-466

  • Question ID: CQ-EVIDENCE-02
  • Decision statement: Confirm disposition for CQ-EVIDENCE-02 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0212
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Engineering Toolchain / Compliance Process
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-467

  • Question ID: CQ-EVIDENCE-03
  • Decision statement: Confirm disposition for CQ-EVIDENCE-03 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0301
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Engineering Toolchain / Compliance Process
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-468

  • Question ID: CQ-EVIDENCE-04
  • Decision statement: Confirm disposition for CQ-EVIDENCE-04 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS123-2-0314
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Engineering Toolchain / Compliance Process
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-469

  • Question ID: CQ-EVIDENCE-05
  • Decision statement: Confirm disposition for CQ-EVIDENCE-05 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS154-0006
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Engineering Toolchain / Compliance Process
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-470

  • Question ID: CQ-EVIDENCE-06
  • Decision statement: Confirm disposition for CQ-EVIDENCE-06 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS154-0019
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Engineering Toolchain / Compliance Process
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-471

  • Question ID: CQ-EVIDENCE-07
  • Decision statement: Confirm disposition for CQ-EVIDENCE-07 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS154-0020
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Engineering Toolchain / Compliance Process
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Decision: D-472

  • Question ID: CQ-EVIDENCE-08
  • Decision statement: Confirm disposition for CQ-EVIDENCE-08 in the RFQX baseline.
  • Decision status: Open
  • Decision owner: Joint
  • Affected Related requirements: RFQX-CVS154-0024
  • Affected feature IDs: To be determined from post-workshop impact.
  • Affected interface IDs: To be determined from post-workshop impact.
  • Affected security capability IDs: To be determined from post-workshop impact.
  • Affected architecture elements: Engineering Toolchain / Compliance Process
  • Baseline impact: Can remain as tracked assumption
  • Follow-up required: yes
  • Evidence / meeting reference: Pending workshop minutes.

Unmatched Answers

Unmatched Customer Answers

  • None.

New Questions From Answers

New Questions From Customer Answers

  • None.